Loch Lomond Drawdown
The draw down is scheduled to begin on November 24, 2021. The lake should be down 4 feet by December 10 at the anticipated rate of 3 inches per day. Gates will be closed and the lake allowed to return to full pool on March 1, 2022.
A list of contractors doing work on our lakes can be viewed by clicking below. This list is not an endorsement.